S09 · Warden campaign, world legendary and aftermath
Implemented components; full stream acceptance is not yet demonstrated.
Current implementation: Regent campaign actions, shared outcomes, Longback field decisions, recovery records and carried campaigns are installed.
Outstanding acceptance: All three full approaches, post-clear life and late-entry journeys remain release requirements.
The four requirements below preserve the original release target. Their historic baseline is not used as a current completion score. This page does not mark the entire stream complete merely because related components are installed.
Reference
| Requirement | Required deliverable | Acceptance standard |
|---|---|---|
| S09.01 · Build the three-route Regent campaign | Implement research, industrial prerequisites, staging, supply custody and acoustic/structural/precision approaches. | Each approach reaches a real final encounter through reachable Floor 1 inputs; no mandatory unique item or artificial distinct-human-count gate. |
| S09.02 · Implement the Regent encounter and global resolution | Produce its mechanics, killed/subdued outcome rules, replacement-support checks, contributions and one-time history. | Two simultaneous groups cannot create contradictory first clears; both sanctioned endings pay off without an administrator choosing flags. |
| S09.03 · Implement the Longback operation | Build sightings, preparation windows, linked squad objectives, maritime supply and hunt/shedding alternatives. | Participation spans declared opportunities and professions; no surprise attendance requirement blocks ordinary floor completion. |
| S09.04 · Ship post-clear life and late-entry pathways | Implement changed dialogue, restored access, professional projects, repeat challenges, final personal acknowledgments and a complete Floor 1 ending. | The road opening delivers its actual Floor 1 promises immediately; no unlocked button routes into an unbuilt Floor 2 screen, and later entrants have a coherent journey. |